More informations:
Prince Regent Inlet.
August 19 to 31.Very open to open drift first-year ice with a trace of old ice melting
completely during the last week of August.
Gulf of Boothia.
August 19 to 31.Over the northern section bergy water. Over the southern section very
open drift first-year ice except for close to very close pack first-year
ice over the southeastern section southwest of Fury and Hecla Strait and
the southwestern section north of Pelly Bay. A trace of old ice embedded
in the pack ice. Ice over the extreme southern section becoming open
drift to close pack ice during the last week of August.
September 1 to 15.
Over the northern section bergy water. Over the southern section very
open to open drift first-year ice with a trace of old ice.
Foxe Basin.
August 19 to 31.Over the northeastern section, along the southeastern shore of Foxe Basin
and the northeastern shore of Southampton Island open drift to close pack
first-year ice becoming very open to open drift ice during the last week
of August. Along the western shore of Foxe Basin very open to open drift
first-year ice becoming very open drift ice during the last week of
August. Elsewhere open water.
September 1 to 15.
Very open to open drift first-year ice over the northern section, along
the southeastern and southwestern shores of Foxe Basin and the northern
shore of Southampton Island. Ice melting completely over the northern
section and along the eastern shore during the second week of September.
Elsewhere open water.
Fury and Hecla Strait.
August 19 to 31.
Open drift to close pack first-year ice with a trace of old ice becoming
very open to open drift ice at the end of August.
September 1 to 15.
Very open to open drift first-year ice with a trace of old ice.
August 19 to 31.
An area of very open to open drift old and first-year ice about 15 miles
north of Cape Bathurst melting completely near the end of August.
Elsewhere open water.
September 1 to 15.
Ice free.
Mackenzie Bay to Cape Bathurst.
August 19 to 31.
An area of very open to open drift old and first-year ice about 15 miles
north of Cape Bathurst melting completely near the end of August.
Elsewhere open water.
September 1 to 15.
Ice free.
Beaufort Sea south of 75°N.
August 19 to 31.
Open water within 15 miles of the shore near Cape Bathurst increasing to
50 miles north of Tuktoyaktuk Peninsula to 100 miles north of the coast
from Herschel Island to Point Barrow. Farther offshore and east of 140°W
close to very close pack old and first-year ice. North of 72°N and west
of 140°W open drift to close pack first-year ice with 2 tenths of old ice
becoming very open to open drift ice during the last week of August.
September 1 to 15.
Open water within 30 miles of the shore near Cape Bathurst increasing to
70 miles north of Tuktoyaktuk Peninsula to 120 miles north of the coast
from Herschel Island to Point Barrow. Farther offshore and east of 142°W
open drift to close pack old and first-year ice. North of 72°30'N and
west of 142°W very open drift old and first-year ice. New ice forming in
the pack ice near mid-September.
Cape Lisburne to Point Barrow.
August 19 to September 15.
Ice free.
Queen Maud Gulf.
August 19 to September 15.
Ice free.
Victoria Strait.
August 19 to 31.
Over the southwestern section very open drift first-year ice. Elsewhere
open drift to close pack first-year ice. Ice melting completely over the
western section and open drift to close pack ice over the eastern section
during the last week of August.
September 1 to 15.
Very open to open drift first-year ice.
Larsen Sound.
August 19 to 31.
Open drift to close pack first-year ice with a trace of old ice becoming
very open to open drift ice during the last week of August.
September 1 to 15.
Ice melting completely over the eastern section during the first week of
September then open water. Elsewhere very open to open drift first-year
ice with a trace of old ice.
Peel Sound.
August 19 to 31.
Very open to open drift first-year ice except for very close pack first-
year ice over the central section about 10 miles southwest of Bellot
Strait and in the extreme northern section. A trace of old ice embedded
in the pack ice over the extreme northern section. Ice becoming very open
drift ice during the last week of August except for open drift to close
pack ice over the northern third.
September 1 to 15.
Very open to open drift first-year ice with a trace of old ice over the
northern third. Elsewhere ice melting completely during the first week of
September then open water.
Viscount Melville Sound.
August 19 to 31.
Over the eastern section close to very close pack old and first-year ice.
Over the southwestern section close to very close pack first-year ice
with up to 2 tenths of old ice. Elsewhere and in shallow bays along the
southern shore open water. Ice becoming close pack ice over the southern
section and open water over the northern section during the last week of
August.
September 1 to 15.
Open drift to close pack old and first-year ice over the southeastern
section. Close pack first-year ice with up to 2 tenths of old ice over
the southwestern section. Elsewhere open water. New ice forming in the
pack ice near mid-September.
M'Clure Strait.
August 19 to 31.
Close to very close pack first-year ice with 2 tenths of old ice except
for very open drift old ice over the northern third.
September 1 to 15.
Close pack first-year ice with 2 tenths of old ice except for very open
drift old ice over the northern third.
1 comment:
Hey, these are some people in a Kayak on the other side and what they are going through....
http://mainstreamlastfirst.com
Post a Comment
Enter your comment(s) here...